Sacyr Proyecta strengthens its presence in Belgium with a new contract for the Zeebrugge LNG terminal.

 

The Spanish company Sacyr Projects has been awarded a contract by Fluxys for the development of services FEED (Front End Engineering Design) at the LNG terminal of Zeebrugge, located in BelgiumThis project covers the engineering for the implementation of new seawater vaporizers (ORV), along with its associated bombs, and a innovative collection box in the port facilities of the terminal.

 

The main objective of this initiative is significantly reduce CO₂ emissions of the terminal, while maintaining its shipping capacity. This action is part of the strategic program of Fluxys to achieve the goal of net zero emissions in all its operations.

 

The relationship between Sacyr Projects y Fluxys spans more than a decade and a half, during which the Spanish company has participated in various crucial projects for the development of LNG facilities in Fluxys and the consequent reduction of its carbon footprint.

 

In the past, Sacyr Projects has played a key role in expanding the regasification capacity of the plant ZeebruggeSince 2011, the company has been involved in the engineering design for the construction of the fifth LNG tank, with a capacity of 180.000 m³, and a second dock Designed to manage loading, unloading and transfer operations between vessels of different sizes, from 700 m³ to the giant 217.000 m³ Q-Flex.

 

 

This new contract focuses on engineering for the installation of innovative systems that seek to reduce CO₂ emissions and move towards net-zero emissions in the plant's operations.

 

 

During the construction phase (EPC) between 2013 and 2020, Sacyr Projects acted as Property Engineering (PMC) all with Fluxys, leading the construction of the fifth tank, the management facilities Boil Off Gas (BOG) and the second berthing pier, demonstrating its comprehensive capacity for large energy infrastructure projects.

 

More recently, in 2023, Sacyr Projects An EPCM project was completed that increased the regasification capacity of the LNG plant to 2,6 million Nm³/h. In parallel, the installation of the new seawater vaporizers began, which not only allow the reduction of CO₂ emissions, but also add new LNG truck loading stations, underscoring the ongoing commitment to sustainability and operational efficiency.

 

With these projects, Sacyr Projects reaffirms its commitment to decarbonization, offering innovative and sustainable solutions that promote a cleaner, more environmentally friendly future.

 

Sacyr Projects is a company with more than 350 professionals, specialized in energy projects. Its expertise extends to key areas such as oil and gas, energy, chemicals and petrochemicals, LNG, and renewable hydrogen. The company is currently involved in large-scale projects such as the new HEH LNG terminal in Stade (Germany), various initiatives for Gate at the Terminal of Rotterdam (Netherlands), a gas compression station in Egypt all with GASCO, a polyethylene plant in Repsol in Puertollano (Spain), and two advanced biofuel plants also for Repsol in Spain. Its latest significant contract was for Elengy, consisting of the renewal of the Montoir-De-Bretagne LNG terminal (France).

 

The commitment of Sacyr with sustainability is reflected in its fight against climate change, prioritizing decarbonization and adaptation as fundamental pillars of its Sacyr Sustainable Route 24-27The company has set an ambitious goal of reducing its absolute greenhouse gas (GHG) emissions and achieving carbon neutrality by 2050.

Coexia®

AI in the foreign trade

Hi! I'm Coexia. How can I help you today with your internationalization strategy?
Coexia AI of foreign trade